Drawing requirement → inspection result → NCR → CAPA → verified closure
A characteristic failure retains its drawing and inspection basis. The resulting NCR identifies affected product and containment. Escalation into CAPA carries the same source identity through cause, action, implementation, effectiveness, and authorized closure.
Open workflow detail →- 01
Controlled drawing
- 02
Inspection plan
- 03
Failed result
- 04
NCR + affected product
- 05
CAPA
- 06
Effectiveness + release